• Skip navigation
  • Skip to navigation
  • Skip to the bottom
Simulate organization breadcrumb open Simulate organization breadcrumb close
Friedrich-Alexander-Universität Chair of Energy Process Engineering
  • FAUTo the central FAU website
  1. Friedrich-Alexander-Universität
  2. Technische Fakultät
  3. Department Chemie- und Bioingenieurwesen
Suche öffnen
  • en
  • de
  • Mein Campus
  • UnivIS
  • FAU-directions
  1. Friedrich-Alexander-Universität
  2. Technische Fakultät
  3. Department Chemie- und Bioingenieurwesen
Friedrich-Alexander-Universität Chair of Energy Process Engineering
Navigation Navigation close
  • Chair
    • Staff
    • Seating plan
    • Job offers
    Portal Chair
  • News
    • News
    • Events
    • Ph.D.-galery
    Portal News
  • Studies and Teaching
    • Courses
    • Theses options
    • The study programme ‘Energy Technology’
    Portal Studies and Teaching
  • Research
    • Research topics Prof. Karl
      • Thermochemical Conversion and Chemical Energy Storage
      • Thermal Storage Systems and Carbon Capture
      • Energy Systems and Energy Economics
    • Research topics Prof. Herkendell
    • Facilities
    • Publications
    • Research networks
    Portal Research
  • Contact
    • Directions
    Portal Contact
  1. Home
  2. Startpage of the Chair of Energy Process Engineering
  3. Research
  4. Research topics Prof. Karl
  5. Thermochemical Conversion and Chemical Energy Storage
  6. CO2freeSNG

CO2freeSNG

In page navigation: Startpage of the Chair of Energy Process Engineering
  • Chair
  • Contact
  • Studies and Teaching
  • News
  • Research
    • Research topics Prof. Karl
      • Thermochemical Conversion and Chemical Energy Storage
        • BMEL-project: FlexBiomethane
        • BMWi-project Ash-to-Gas
        • BMWi-Project BiogasGoesHydrogen
        • BMWi-project: FlexSOFC
        • BMWi-project: IntenseMethane
        • BMWi-Project: KonditorGas
        • BMWi-project: ORBIT
        • BMWi-project: Power-to-Biogas
        • CO2freeSNG
        • CO2freeSNG 2.0
        • EnCN – project part 'Große Speicher'
        • EU-Project CarbonNeutralLNG
        • EU-Project i³upgrade
        • Load-flexible high-temperature electrolysis
        • Renewable hydrogen in the natural gas grid
      • Thermal Storage Systems and Carbon Capture
      • Energy Systems and Energy Economics
    • Research topics Prof. Herkendell
    • Publications
    • Research networks
    • Facilities

CO2freeSNG

EU-Project: CO2freeSNG

The production of methane as a natural gas substitute (SNG) is one of the possible contributions to the energy mix of the future. In addition, bioenergy is easier to transport and store via the route of SNG production and through the use of the already existing natural gas infrastructure. Under the current conditions, production of SNG is only economically viable on a large scale from coal and all secondary products. In order to be able to produce SNG even in a smaller power range suitable for biomass applications, the plant complexity must be minimised. Within the framework of the EU project “CO2freeSNG”, simplified plant concepts were developed through process optimisation and increased system integration. A particularly high optimisation potential is provided by the hot gas purification of synthesis gas.

Coal-to-SNG Process scheme including allothermal gasification, hot gas cleaning, methanation, and gas conditioning
SNG process chain

In the course of the research project, the entire process chain of SNG production, from allothermal gasification, through hot gas cleaning to methane synthesis, was investigated. The focus of the work presented here is on hot gas purification and methanation, which is an integral part of the hot gas purification process.

Main impurities in the product gas of biomass gasification are not only particles, but also alkali and sulfur compounds, especially higher hydrocarbons and tars. Particles and alkalis are deposited in sintered metal filters. Sulfur compounds are removed from the gas via high-temperature fixed-bed adsorbers with different adsorbents.

 

Bench-scale test stands for fluidized bed gasification, hot gas cleaning, methanation, and gas supply station
Experimental setup CO2freeSNG

Particularly promising is the fact that tars are not purified but are directly converted in the course of methane synthesis and are thus available as an additional starting material for methane production. In addition to excluding the tar cleaning, this also leads to an increase in the efficiency of the process.

 

For more information, please visit:: www.co2freesng.eu

 

Contact Person:

Dr.-Ing. Treiber, Peter

Dr.-Ing. Peter Treiber

Department of Chemical and Biological Engineering
Lehrstuhl für Energieverfahrenstechnik

  • Phone number: 09115302-99035
  • Email: peter.treiber@fau.de
Friedrich-Alexander-Universität
Erlangen-Nürnberg

Schlossplatz 4
91054 Erlangen
  • Imprint
  • Privacy
  • Accessibility
  • Facebook
  • RSS Feed
  • Twitter
  • Xing
Up